中文
English
About
Company
Subsidiaries
Edge
History
Culture
Technology
Credentials
Founder
Products
Immersion-Cooled AIDC Cube
Green AIDC
Battery Module
ESS
PCS
LCS
FSS
EMS
BMS
Container Cluster
Immersion-Cooled AIDC Cube
Integrated Container
Integrated Immersion-Cooled Edge Data Center Container
Immersion-Cooled Battery Pack
6.25MWh Liquid-Cooled Battery Container
4.7MWh Immersion-Cooled Battery Container
125kW/261kWh Immersion-Cooled All-in-One ESS
125kW/261kWh Liquid-Cooled All-in-One ESS
60kW/208kWh Liquid-Cooled All-in-One Hybrid ESS
125kW/261kWh Immersion-Cooled All-in-One Hybrid ESS
60kW Hybrid inverter
130kW PCS
215kW PCS
Overhead Liquid-Cooled Units
Fire Suppression System
AI Spot Market Strategy System
Multi-Energy Microgrid Management System (MEMS)
Distributed EMS
Centralized EMS
Battery Management System
Solutions
Green Power
Smart Microgrid |
Mining Area Microgrid Solution
Smart Microgrid |
C&l Microgrid Solution
Smart Microgrid |
Island Microgrid Solution
Smart Microgrid |
PV-Wind-ESS-Charging Microgrid Solution
Smart Microgrid |
Net-Zero Park Microgrid Solution
Others |
C&I ESS Solution
Others |
Distribution Area Backup Power
Others |
Emergency Backup Power
Green AIDC
Green Power
Standalone BESS
Smart Microgrid
Others
Green AIDC
Flexible AIDC
Application
Standalone BESS
Mining Area Microgrid Solution
C&l Microgrid Solution
Island Microgrid Solution
PV-Wind-ESS-Charging Microgrid Solution
Net-Zero Park Microgrid Solution
C&I ESS Solution
Distribution Area Backup Power
Emergency Backup Power
Flexible AIDC
News
Company News
Project Updates
Support
Documents Center
Service Models
Get A Quote
Contact
2026-07-02
Kortrong's Immersion-Cooled BESS Draws Thai Ministry of Energy and Regional Industry Leaders at ASEW 2026
Learn more
2026-06-30
Kortrong Launches 6.25MWh Liquid-Cooled ESS as Storage Race Shifts from Specs to Returns
Larger plants, smarter architecture, bankable returns — Kortrong's 6.25MWh liquid-cooled ESS enters the market.
Learn more
2026-06-11
Grid-Forming Storage + SST: Defeating the Volatility of High-Penetration Green Power in AIDCs
Learn more
Company News
Project Updates
500 Days of Worry‑Free | Central China’s Largest Immersion-Cooled Standalone BESS @ Xinyang, Henan
2026-05-29
Kortrong's 0ms Online Solar‑Storage System: Uninterruptible Power to End 'Blackout' Woes in Weak‑Grid Regions
2026-05-26
Kortrong AIDC Wins 2026 GGII AIDC Supply Chain Pioneer Award
2026-05-22
Kortrong’s 130kW PCS Has Passed UK G99 Grid Certification
2026-05-11
EDF Visit Kortrong for Dedicated Tests on Immersion Liquid Cooling Technology
2026-04-28
Unplug to Recharge: When Rest Becomes Part of the Algorithm
2026-04-24
Kortrong Group Selected as Core Case Study for CBS-Owned Station Documentary Green Pulse of the Greater Bay Area
2026-04-10
Kortrong International Forges Strategic Partnership with Beta Energy to Accelerate Southeast Asia Expansion
2026-04-07
Kortrong Powers Swedish Energy Agency's ALT-BESS Research Initiative
2026-04-01
上一页
1
2
3
4
5
6
7
8
9
下一页