Hebi, Henan | Grid-Side Standalone BESS Project
Project Overview
  • LocationHebi, Henan, China
  • Scale100 MW / 200 MWh
  • ValueCommissioned 2023; delivers regional peak-shaving, renewable firming and system inertia support; equipped with primary/secondary frequency regulation and black-start capability to anchor a secure, efficient and flexible next-generation grid
  • CategoryGrid-side centralized BESS

 Energised in 2023, the 100 MW/200 MWh Hebi centralized BESS provides peak-shaving, frequency regulation and black-start services, strengthening Henan’s grid stability and renewable utilisation.

Recommended products
Solution