Zhongshan, Guangdong I C&I BESS
Project Overview
  • LocationZhongshan, Guangdong, China
  • Scale​1.44MW / 2.796MWh
  • ValueSaving utility price by charging during off-peak hours and discharging during peak hours
  • CategoryC&I ESS

image.png

Scenarios

Tailored for SMEs, hospitality, C&I and luxury residences, remote oil fields.


Mode

To compensate for insufficient power supply, partially replace grid electricity and diesel generation (DG) with PV green power to reduce costs, cut DG operation/standby time (prolonging lifespan), and serve as a standalone backup.


Value

Provide PV-generated green electricity to replace/reduce diesel genset usage, lowering energy costs; serve as backup power during grid outages to enhance supply stability.


    All-in-one solution from Kortrong

  1. DC-coupled photovoltaic storage for high energy efficiency

  2. Integrated converter supports grid-connected/off-grid operation, grid-building, 1.5x overload capacity, and enhanced load adaptability

  3. Enables simultaneous access to photovoltaic, city power, and diesel generation with intelligent multi-source coordination

  4. Supports multi-unit parallel connection for flexible expansion


Recommended products
Solution